I-495/ Dulles Toll Road Interchange Information Page

VDOT and the Metropolitan Washington Airports Authority (MWAA) initiated a detailed review of the proposed design and operations for the Capital Beltway HOT Lanes Project ramps relative to the Dulles Toll Road (DTR)/Dulles International Airport Access Road (DIAAH) and the I-495 Interchange.  Efforts are underway to provide new and revised access at the interchange of DTR/DIAAH and I-495. The new proposed ramps will restore direct access to/from the DIAAH as had been originally provided for almost 25 years, until 1984 when the DTR was constructed.

SEGMENTS 1 AND 2
As part of the Capital Beltway HOT Lanes Project, construction is now underway for Segments 1 and 2. This work is expected to continue into late 2012. Motorists are currently shifted at the eastbound Dulles Toll Road as they approach the exits for I-495 to one lane exiting to I-495 north and two lanes exiting to I-495 south. This traffic pattern is expected to be in place for until late 2012.  Crews have cleared the area along the eastbound Dulles Toll Road to I-495 south to shift the exit ramp out to a new alignment by spring 2011. Crews shifted lanes along the westbound Dulles Toll Road near the I-495 interchange to create additional room to advance work and place pavement.

  • Behind the barriers, crews are working to install new drainage, relocate utilities and place pavement for upcoming traffic shifts.
  • Complete selective clearing and grading
  • Continue drainage work and installation of box culverts and pipes
  • Continue pile driving for new bridge and ramp connections.
  • Construct bridge piers and abutments
  • Construct retaining walls

Segment 1

  • New DIAAH Access Exit Ramps from eastbound DIAAH to southbound I-495
  • Existing eastbound DIAAH will need to be shifted
  • Existing Ramps to I-495 southbound will need to be reconfigured

Segment 2

  • New DIAAH Access  Exit Ramps from eastbound DIAAH to northbound I-495
  • Existing Ramps to I-495 northbound will need to be reconfigured

Documents Center

I-495/Dulles Toll Road (Route 267) Meeting Brochure - Citizen Information Meeting, Nov. 10, 2009 (649 KB)
Information Meeting Comment Form- Please submit comments by Nov. 24, 2009 (21 KB)
Presentation from Citizen Information Meeting, Nov. 10, 2009 (3.1 MB)
Meeting notice post card  (102 KB)
Official newspaper notice (16 KB)

Display Boards

Before and After (13MB)
Proposed design modification (16.3 MB)
Weave Segments (15.8 MB)
Noise Barriers (2.3 MB)
Wetland/Streams and Park/Trails (2.3 MB)
Right of way Northwest (385 KB)
Right of way Southwest (694 KB)

Noise Barrier 13B Cross Section View at Dulles Toll Road and I-495

Section Index (431 KB)
Section A (120 KB)
Section B (120 KB)
Section C (129 KB)
Section D (126 KB)
Section E (70 KB)
Section F (70 KB)

Noise Barrier 13B Exhibits

Exhibit 1 Aerial (8.6 MB)
Exhibit 2 Aerial (9.6 MB)
Exhibit 3 Aerial(3.6 MB)
Exhibit 4 Aerial (13.3 MB)

Comment Report 

Comment Report (128 KB)

Comment Report Documents

Photo of Culvert
Section HH View 1 (57.1 KB)
Roadway Plans Showing G and H (359 KB)
Cross Sections for 1355 (110 KB)
Section HH View 2 (80.5 KB)
Cross Section for I-495 (52.3 KB)
Drainage DAAR and 1355 (213 KB)