Virginia.gov
Virginia Megaprojects Logo Virginia Department of Transportation & Department of Rail and Public Transportation
  • Lane markings prepare parkway for Sept. 21 opening.
    Lane markings prepare parkway for Sept. 21 opening.
  • The Barta Rd. bridge leads into the Fort Belvoir North Area.
    The Barta Rd. bridge leads into the Fort Belvoir North Area.
  • Multi use trails will be part of the parkway when completed.
    Multi use trails will be part of the parkway when completed.
  • Looking north at the Barta Rd. bridge, 7/8/2010
    Looking north at the Barta Rd. bridge, 7/8/2010
  • The bridge is surfaced at Fullerton Rd., 7/8/2010
    The bridge is surfaced at Fullerton Rd., 7/8/2010
  • The ramp to Boudinot Dr. emerges, 7/8/2010
    The ramp to Boudinot Dr. emerges, 7/8/2010
  • Looking west, 3 parkway bridges near completion, 7/8/2010
    Looking west, 3 parkway bridges near completion, 7/8/2010
  • Alban Rd. exit bridge from I-95 progresses, 6/29/2010
    Alban Rd. exit bridge from I-95 progresses, 6/29/2010
  • Bridge over Accotink Creek makes progress, 6/29/2010
    Bridge over Accotink Creek makes progress, 6/29/2010
  • 6/29/2010, paving reaches Barta Rd. bridge
    6/29/2010, paving reaches Barta Rd. bridge